| The current front view of the plot. The original old bungalow is now gone, and behind it the first part of construction has reached the second floor. |


| Door frames and windows are all installed on the ground floor and first floor. | Walls are mostly completed on the second floor. |


| Stairway to a future level, with the top of the dome of the Deities' Temple visible in the background. | Looking across the top of construction so far. |


| Meanwhile, looking back towards the road, a large pit marks the location of the former bungalow, where preparations take shape for the foundations of a second building about to grow here. |


| Deepening the foundations, despite the rains. |


| Iron reinforcement bar frameworks for the beginning of the next phase of construction. |